Nafasi za kazi 73 Mgodi wa North Mara. he North Mara gold mine is located in north-west Tanzania in the Tarime district of the Mara region.
Nafasi za kazi 73 Mgodi wa North Mara |
Nafasi za kazi 73 Mgodi wa North Mara
Nafasi za kazi 73 Mgodi wa North Mara
About Nafasi za kazi 73 Mgodi wa North Mara
Nafasi za kazi 73 Mgodi wa North Mara. Mwisho wa kutuma maombi ni tarehe 8 June 2021. The North Mara gold mine is located in north-west Tanzania in the Tarime district of the Mara region.
About North Mara Gold Mine
North Mara Gold Mine is a combined open pit and underground gold mine in the Tarime District of the Mara Region of Tanzania. It is one of three gold mines of Acacia Mining plc, a company listed on the London Stock Exchange, that operates in Tanzania, the other two being Bulyanhulu and the Buzwagi Gold Mine.Â
Read Also:
- 4 New Job Vacancies at KCT Motors Limited 2022
- Â 7 Job Vacancies at Ardhi Institute MorogoroÂ
- Job Opportunity at Watu - Portfolio Quality Officer
Nafasi za kazi 73 mgodi wa North Mara
1. Senior Maintenance Planner (02 Vacancies)
2· Hauling Equipment Operator III - Dozer (06 Vacancies)
3· Hauling Equipment Operator III – Loader (06 Vacancies)
4· Hauling Equipment Operator III – Excavator Rock Breaker (09 Vacancies)
5· Hauling Equipment Operator III – Grader (03 Vacancies)
6· Hauling Equipment Operator III – Production Shovel & Excavator (06 Vacancies)
7· Hauling Equipment Operator II – Truck (30 Vacancies)
8· Tire Fitter (02 Vacancies)
9· Supervisor Excavator Maintenance (01 Vacancy)
10· Supervisor Drill Maintenance (01 Vacancy)
11· Supervisor CAT Maintenance (01 Vacancy)
12· Maintenance Superintendent (01 Vacancy)
13· Maintenance Scheduler (02 Vacancies)
14· Data Administrator (02 Vacancies)
15· Crane Mechanics (01 Vacancy)
All applications must be submitted through; [email protected], noting the job title in the subject line of the email.
Nafasi za kazi 73 Mgodi wa North Maraa
The North Mara gold mine is located in north-west Tanzania in the Tarime district of the Mara region. It is around 100 kilometres east of Lake Victoria and 20 kilometres south of the Kenyan border.
North Mara started commercial production in 2002. The mine is a combined open pit and underground operation from two deposits, Gokona (underground) and Nyabirama (open pit). The process plant has the capacity to process an average of 8,000 tonnes of ore per day.